Primera made in China – replacement parts – in Austin United States P12 49001-BV000 Power Steering Rack with ce certificate top quality low price

Primera  made in China - replacement parts -  in Austin United States  P12 49001-BV000 Power Steering Rack with ce certificate top quality low price

Primera  made in China - replacement parts -  in Austin United States  P12 49001-BV000 Power Steering Rack with ce certificate top quality low price

We – EPG Group the bigge EPT Chain and agricultural gearbox manufacturing facility in China with 5 diverse branches. For much more details: Mobile/whatsapp/telegram/Kakao us at: 0086~13083988828 13858117778 0571 88828

PRIMERA P12 49001-BV000 Energy steering rack

A:Personalize support accept:

Diamond holding an powerful twelve staff improvement staff ,Our SDE will build 4 new designs each month. welcome to supply OE samples to develp for ur special market 

B: Particulars

 

Product Details:
Software: PRIMERA P12
OE NO.: 49001-BV000 
Sort: EPT power steering equipment
Measurement: Normal
Xihu (We EPT Lake) Dis. Travel: LHD
Shade: BLACK
Weight: 7KGS
Packing Dimensions: 1220*a hundred sixty five*285mm
EPT Potential: 15000 pcs for every thirty day period
 
Specifications:
1.P EPT examine our information image shows
2.OEM services offered
3.When u fir EPT purchase require not much more than 50pcs p EPT sent me an e mail to inquiry
4.Brand design accepted.
 
After-Sale Provider
1. In 1 12 months, if the merchandise are not broken by individuals or not crack-up for repairing, return the problematic merchandise to us, we can manage the domestic freight and give A single Adjust FOR One services for you.
2. If you buy 100 pcs, we can ship you a hundred and one pcs, the additional 1 is for alternative, the other individuals we get no obligation.
 
Packing Specifics
1. EPT packing
2. Brand name packing.(Pack with clients’ brand, but the brand must be registered in China.)

DKM Ensure:
Use neutral or customer model packing, DKM ensure time period is 1 calendar year from shipping date,if use our DKM packing our guarantee period of time can be 2 a long time from delivery date.

 
 

C:FAQS

1.

   Are you a investing company or a manufacturing facility?
   Hello, we are a manufacturing unit.Welcome to visit our manufacturing unit.
 

2.

   Where is your business?
   Hello,our manufacturing facility is situated in Guangyao,Shishan,Xihu (We EPT Lake) Dis. District,HangZhou metropolis,ZheJiang Province, exactly where is around the Guanbao Street exit of HangZhou Yihuan Freeway(2 kilometers away from Fir EPT Automobile-Volkswagen manufacturing facility and 45 kilometers away from HangZhou Xihu (We EPT Lake) Dis. Airport inside of sixty minutes driving).

three.
 When did you start to produce electricity steering rack?
 Hello, Our firm has been committed to investigation & development and creation of electrical power steering racks because 1996.

4.
 Does your organization have EPT Entrusted Manufacture expertise?

 Hello, we have the support support experience with the auto OEM factory that we provided sole assistance service for Prado’s product to ZheJiang Automobile producer in 2001. Our company has centered on Car aftermarket considering that from 2009.During these time, we cooperate with the manufacturing facility who has the demand from customers of racing auto steering racks. We accomplishment to apply our technological innovation to the racing vehicle field and get acceptance from our consumers.

5.
 How prolonged does it need to have to create new steering rack?
A:  Soon after obtaining the new sample from the client, we start to appraise development process. Normally require about a hundred and twenty days. But it largely relies upon on the complex issues coefficient of new goods. If the item with excellent problems, growth cycle may possibly be extended thinking about the actual predicament encountered in the trial-creation procedure.

6: 
 How does your firm manage the good quality of the Items? 
A:    We select superior provider for the raw substance components.

B:   To make sure the item top quality, we comply with up the IATF 16949 high quality administration program strictly in the creation procedure.
C.      We have tests equipment like three coordinate measuring machine, Gear tooth detection middle, laptop testing products of steering rack assembly to ensure the products can totally exchange the original samples, no matter whether from merchandise set up and use, or functionality and good quality facets to meet OE product requirements.

D.      Assembly of power steering racks shall be executed in stringent accordance with the assembly line. Each steering rack shall be continually assembled from spare parts to assembly through the assembly line. The next measures are air tightness check, high pressure check, interior and exterior leakage take a look at, force torque te EPT and computer assembly take a look at. Following every solution is tested on the assembly line, we will laser engraved manufacturing serial variety which can be used to traces the item high quality. In addition, each and every batch of items will be randomly sampled by the good quality division and taken to the laboratory for inspection to monitor the quality.

seven.   Do you have simulated road te EPT for your goods?
Hi there,

  1. The OE samples are supplied by our buyers and the simulate road te EPT is carried out by our consumers.
  2. We always disassemble the OEM steering rack from our firm-owned automobile, and install the 1 launched out by ourselves to have a test.
  3. We have consumers of off-highway racing. Our products’ good quality can be upgraded due to the fact of consistently obtaining the actual data from the software of our steering racks for racing vehicles.
  4. The R&D of our merchandise is primarily based on the parameters of OE sample, so as to make sure it can totally change the original steering rack in installation, use, efficiency and good quality. The trial installation is finished by cooperative buyers who will give suggestions

eight. MOQ
Hi, our MOQ count on various situations as underneath:

  1. No MOQ required if the items are off-creation line.
  2. No MOQ necessary if the goods are on our production schedule.
  3. As for those parts with out manufacturing plan, 30/fifty/100pcs would be all satisfactory. We will set up creation schedule when the accumulated amount achieve to five hundred pcs, the far more amount you get the before we begin to make.

9: How prolonged would be the delivery time?

The delivery time is according to diverse generation problem, specifically as follows

  1. It takes fifteen days from purchase to delivery for the off-line items.
  2. It normally takes sixty days from order to shipping and delivery for merchandise with generation plan.
  3. Usually it normally takes 70 to 90 days for goods with out generation schedule. Make sure you get in touch with the product sales for the precise shipping time.

ten:  How extended is the guarantee interval?
The warranty period is twelve-24 months given that the shipping day.
a. The guarantee period is 24 months with DKM packing
b. The guarantee interval is 12 months with neutral or the EPT packing.

  1.  Make sure you deliver your cost list.

Hi, we are not a buying and selling company, so the cost is up to the quantity to a excellent diploma. Remember to suggest your qty and packing demands we will offer you the sensible costs.

12. About soon after-sale services
Each steering rack has manufacturing serial number on it. If there is any high quality problems, please get photograph of the serial amount and state the problems in detail to salesman who will comments to our R&D department. If it is testified that the product itself has the high quality issue, we will supply exact same brand new solution or EPT product on the very same worth for free of charge as the compensation in the following purchase.
 

The use of unique gear manufacturer’s (OEM) part quantities or logos , e.g. CASE® and John Deere® are for reference needs only and for indicating item use and compatibility. Our company and the shown alternative elements contained herein are not sponsored, accredited, or made by the OEM.

Primera  made in China - replacement parts -  in Austin United States  P12 49001-BV000 Power Steering Rack with ce certificate top quality low price

Primera  made in China - replacement parts -  in Austin United States  P12 49001-BV000 Power Steering Rack with ce certificate top quality low price

Primera  made in China - replacement parts -  in Austin United States  P12 49001-BV000 Power Steering Rack with ce certificate top quality low price

Tags:

roller chain coupling

As one of leading roller chain coupling manufacturers, suppliers and exporters of mechanical products, We offer roller chain coupling and many other products.

Please contact us for details.

Mail:[email protected]

Manufacturer supplier exporter of roller chain coupling.

Recent Posts