in Kabul Afghanistan sales price shop near me near me shop factory supplier Elt-125 High Efficieny Low Energy Roots Blower manufacturer best Cost Custom Cheap wholesaler

  in Kabul Afghanistan  sales   price   shop   near me   near me shop   factory   supplier Elt-125 High Efficieny Low Energy Roots Blower manufacturer   best   Cost   Custom   Cheap   wholesaler

We are looking forward to developing profitable organization associations with new clientele around the planet in the future. We will supply ideal solutions and large top quality products with all sincerity. EPG has been productively licensed by ISO9002 High quality Management System, ISO9001 Good quality Administration Method, API certification, ISO/TS16949:2002 and ISO10012 measurement management system. We make all kinds of roots blower, centrifugal blower, Our Primary products are as beneath:

Type Diameter Rate of flow Stress
ESR-MJ(Intense Variety) Phi50~ Phi300mm .five~140m sup3/min nine.8KPa~ninety eight.8Kpa
ESR(Common Sort) Phi50~ Phi350mm .five~140m sup3/min 9.8KPa~seventy eight.4Kpa
ESR-H(EPT-strain Type) Phi50~ Phi350mm .seven~160m sup3/min fifty eight.8KPa~ninety eight.8Kpa
ESR-V(Vacuum EPT) Phi50~ Phi350mm .5~160m sup3/min 9.8KPa~fifty three.3Kpa
EL Collection Phi200~ Phi600mm 20.3~750m sup3/min 9.8KPa~fifty eight.8Kpa
Multistage Centrifugal Blower
or C-Series
Phi250~ Phi500mm fifty~500m sup3/min 9.8KPa~98Kpa
ERR-ERG Variety Phi250~ Phi500mm 120~420m sup3/min 9.8KPa~ninety eight.8Kpa

The doing work theory of the a few-blade roots blower: two three-lobed rotors are arranged in the cavity, and the
suction port and the discharge port are opened on both sides of the cavity. By way of the action of a pair of
synchronous EPTs, the two rotors rotate in reverse instructions and Relying on the mutual engagement of the two
rotors, the suction port and the discharge port are isolated, and the gas in the chamber is pushed to attain the
function of blowing.

Attribute of our roots blower:
one. Huge adjustment of the air volume
2. Minimal Noise
three. EPT effectiveness
four. Reduced power cosumption
five. EPTT time lifestyle
six. Reliable managing, simple servicing,tiny footprint

The parameters of our roots blower:

Sort Ratary Speed
(r/min)
Force Increase
(Kpa)
Capacity
(m/min)
Shaft EPTT
(Kw)
EPT Device MaXiHu (West EPT) Dis.mn
Weight(Kg)
EPTT
(Kw)
ESR-fifty 1100-2120 nine.8-fifty eight.eight .sixty five-2.58 .three-three.fifty four .seventy five-four 128-158
ESR-sixty five 1100-2130 9.8-fifty eight.8 .ninety four-three.66 .38-4.46 .seventy five-5.five 155-185
ESR-80 1140-1900 nine.eight-fifty eight.eight two.34-five.43 one.04-seven.42 2.two-11 155-277
ESR-100 1060-1980 9.eight-fifty eight.eight four.fifty seven-9.05 1.35-twelve.fifteen three-15 309-377
ESR-a hundred twenty five 980-1850 nine.eight-fifty eight.8 five.35-twelve.four one.65-five.19 5.five-eighteen.5 408-451
ESR-125C 970-1830 nine.eight-58.eight 7.5-seventeen.fifty seven three.2-18.5 four-22 408-451
ESR-150 810-1730 nine.8-58.eight 10.37-27.15 three.eighty four-forty.eighty two 7.5-45 688-848
ESR-one hundred seventy five 970-1520 nine.8-58.eight 19.sixty five-36.65 seven.2-forty five.95 11-55 980-1080
ESR-200B 740-1450 nine.eight-fifty eight.8 19.sixty five-forty four.eight 10.fifteen-sixty.44 fifteen-seventy five 1272-1546
ESR-200 810-1480 9.eight-58.eight 27.65-fifty nine.2 eight.05-80,twelve 15-ninety 1272-1546
ESR-250B 1100-1480 9.8-58.eight 54.seventy seven-seventy seven.55 19.97-ninety.97 30-110 1490-2454
ESR-250 990-1480 nine.eight-fifty eight.8 sixty one.4-ninety seven.fifty two 20.1-117.three thirty-132 1490-2454
ESR-300 990-1480 9.eight-58.8 87.1-138.one 26.four-167.8 37-185 3326-3446
ESR-350 730-1480 nine.eight-fifty eight.eight seventy eight.forty one-177.31 55-250
ESR-50H 1230-2120 sixty three.7-ninety eight .forty five-2.02 two.05-6.12 three-seven.five one hundred sixty–one hundred seventy
ESR-65H 1240-2130 sixty three.seven-ninety eight .seventy eight-two.fifty three two.89-7.fifty five four-11 198-230
ESR-80H 1140-1900 63.7-98 1.82-four.fifty five four.09-10.1 five.5-15 316-326
ESR-100H 1060-1980 63.seven-ninety eight 2.sixty five-8.06 6.36-seventeen.2 seven.5-22 398-459
ESR-125H 980-1850 63.seven-ninety eight 4.sixty four-11.23 eight.92-24.2 eleven-30 544-630
ESR-150H 810-1730 63.seven-98 nine.53-twenty five.seventy six seventeen.sixteen-sixty five eighteen.five-75 752-1571
ESR-200H 810-1480 sixty three.seven-98 25.34-fifty six.92 42.34-one hundred twenty fifty five-132 1426-1934
ESR-250H 990-1480 sixty three.7-98 58-93.7 eighty three.two-205 90-220 2980-3468
ESR300H 990-1480 sixty three.7-98 86.9-134.1 114.seven-270 132-280 3476-3998
ERF-245 650-980 nine.eight-ninety eight forty seven.five-ninety seven.four sixteen-183 eighteen.five-two hundred 3630-3690
ERF-250 650-980 9.eight-98 sixty one.6-120.four 19-227 22-250 4450-4500
ERF-290 650-980 9.eight-78.4 92.3-128 22-213 thirty-250 4890-4710
ERF-295 650-980 nine.8-78.four 97.3-152.five 23-227 30-250 4890-4880
ERF-297 650-980 9.eight-seventy eight.4 87.5-167.six 26-249 30-280 5330-5520
ERF-three hundred 650-980 9.eight-78.4 a hundred and one.5-188.7 29-278 37-315 5330-5520
ERF-350 650-980 9.eight-78.four 126-224.9 34-249 forty five-280 5210-6470
ERG-300 590-730 9.8-ninety eight 128.3-196 38-362 45-400 9440-15710
ERG-350 590-730 9.8-ninety eight 159.three-231.6 43-420 fifty five-450 9700-1571
ERG-400 590-730 9.eight-eighty three.three 203.1-290.9 fifty two-449 75-five hundred 10090-11390
ERG-445 590-730 nine.8-73.5 229.7-327.eight 58-477 seventy five-560 10600-12230
ERG-450 590-730 nine.8-73.5 262.4-366.2 64-496 seventy five-560 10600-12230
ERG-500 590-730 nine.eight-63.seven 327.four-452.4 78-529 90-560 12790-14620
ERF-240-V 650-980 -nine.8- -forty nine 38.one-78 13-seventy six 18.five-90 3420-3285
ERF-245-V 650-980 -9.8- -forty nine forty seven.5-97.4 sixteen-ninety five 22-a hundred and ten 3425-3360
ERF-250-V 650-980 -nine.8- -49 63-120 19-117 22-132 3910-3830
ERF-290-V 650-980 -9.8- -49 72.6-a hundred and forty four 22-136 thirty-a hundred and sixty 4415-4270
ERF-295-V 650-980 -9.eight- -49 seventy six.six-152 23-145 30-one hundred sixty 4425-4485
ERF-297-V 650-980 -9.eight- -forty nine 84.3-166.8 26-one hundred sixty thirty-a hundred and eighty 5000-4980
ERF-300-V 650-980 -9.8- -forty nine ninety seven-192 29-178 37-200 5000-4980
ERF-350-V 650-980 -9.eight- -49 116-225 34-209 45-250 5400-5700
ERG-300V 590-730 -nine.8- -49 133-193 38-184 45-220 7800-9100
ERG-350V 590-730 -nine.8- -forty nine 163-231 43-216 55-250 9500-9470
ERG-400V 590-730 -nine.8- -forty nine 199-290 fifty two-269 seventy five-315 9900-10130
ERG-445V 590-730 -9.eight- -forty nine 224.eight-326.9 fifty eight-303 seventy five-355 9900-10130
ERG-450V 590-730 -9.8- -49 255-365 64-335 75-four hundred 11230-11300
ERG-500V 590-730 -nine.eight- -49 314-452 seventy eight-412 132-450 13630-13850
ERF-245W 650-980 -13.3- -53.three 53.5-one zero one 21.five-102 thirty-110 3630-3360
ERF-250W 650-980 -thirteen.three- -53.three 69-127 26.5-127 30-one hundred sixty 3985-4115
ERF-290W 650-980 -thirteen.three- -53.three 82.six-one hundred fifty 30.five-149 37-185 4340-4580
ERF-295W 650-980 -13.3- -53.3 87-158 32-158 37-185 4440-4580
ERF-297W 650-980 -thirteen.3- -53.3 ninety five-174 36-174 forty five-two hundred 5230-5130
ERF-300W 650-980 -13.three- -53.three 109-195 40-193 55-220 5230-5130
ERF-350W 650-980 -thirteen.three- -fifty three.three 129-230 fifty-230 75-250 5840-5670
ERG-300W 590-730 -thirteen.3- -53.three 142-197 fifty two-201 seventy five-220 9100-9000
ERF-350W 590-730 -13.three- -fifty three.three 168-234.4 fifty nine-235.5 75-280 9500-9600
ERG-400W 590-730 -13.3- -fifty three.3 220-276.6 seventy one-292 ninety-315 9900-10130
ERG-445W 590-730 -thirteen.three- -fifty three.3 244-294.six eighty two-331 90-four hundred 11230-11300
ERG450W 590-730 -13.three- -fifty three.3 275-368.five ninety one-366 one hundred ten-400 11230-11300
ETRF-250
(240,250)
650-980 98-196 sixty four.8-112 one hundred thirty five-355 one hundred sixty-400 8700-8600
ETRF-295
(245,295)
650-980 98-196 80.eight-139 167-439 185-500 9200-9100
ETRF-300
(245,295)
650-980 ninety eight-176.4 102-174 206-497 250-560 10320-10500
ETRF-350
(245,295)
650-980 98-137.2 124-207 241-473 280-560 10700-11110
ETRG-400
(three hundred,four hundred)
590-740 98-176.four 205-273 380-773 450-900 21350-24200
ETRG-450
(350,450)
590-740 ninety eight-176.4 263-428 476-955 560-one thousand 24200-27600
ETRF-250W
(240,250)
650-980 -53.three–80 72-121 75.six-121 90-a hundred and sixty 6100-6470
ETRF-295W
(245/295)
650-980 -fifty three.three–80 ninety three.8-154 99.five-186 a hundred and ten-220 7000-6400
ETRF-300W
(2505/three hundred)
650-980 -53.three–eighty 116-189 a hundred and fifteen-220 132-250 7750-7760
EL81WD 580-980 9.eight-58.8 fifty four.2-130 18-151 45-185 3595
EL82WDB 580-980 nine.8-fifty eight.8 seventy two.eight-161 22-191 45-220 3860
EL83WDA 580-980 nine.8-fifty eight.9 a hundred and one-213 28.five-202 forty five-220 4300
EL84WDA 580-980 nine.8-58.eight 129-267 35.4-252 45-280 4720
EL93WDA 580-730 nine.8-forty nine 230-329 56.4-311 seventy five-355 7765
EL94WDA 580-730 9.8-49 263-373 64-353 75-400 8130
EL95WDA 490-580 9.eight-58.8 308-434 eighty one.4-414 90-450 11500
EL96WDA 580 58.eight 381 497 560 11500
E397WN a thousand-1650 40 5-nine
E408WN 870-1650 forty ten-22
E517WN 980-1580 40 twenty-thirty
E520WN 930-1550 forty 24-forty five
E607WN 750-1250 forty forty five-76
E610WN 750-1250 40 seventy five-130

EPT components and construction of our roots blower:

Bundle of our Roots Blower

Pack into iron scenario, two layer,blower physique and motor in reduce layer, inlet/out silencer etc in higher layer

Roots blower pack strategy exact same as iron case, just change to Fumigation Cost-free Plywood Scenario

Our manufacturing facility is a expert producer of Roots blowers which has over twenty years’ encounter in EPTTry
producing. It is situated in XiHu (West EPT) Dis.hu (West EPT) Dis. EPT EPTT Park, 50 kilometers to the EPT of ZheJCEP provincial
money— EPTEPTTn. Our firm also has handy site visitors transportation, as it is fifteen kilometers away from
Diaozhen Town station of EPTTngdao-HangEPT expressway, and 30 kilometers away from EPT EPTEPTTn station of
BeiEPTTg-ZheJCEP expressway.The major solution of our firm is ESR -kind Roots Blower. The roots
EPT pump is a new variety of higher-effectiveness roots blower, which is deveXiHu (West EPT) Dis.Hu (West EPT) Dis.ed independently based mostly on the
domestic and overseas EPTd systems. Several patEPTTd systems have been adopted on Roots
Blower, and hence we have manufactured significant consequences in vitality conservation and sound reduction, etc.. So significantly, our
firm has invested more than 30,000,000 RMB to introduce this sort of EPTd skilled tools as
horizontal machining cEPTTr, vertical machining cEPTTr, two-way CNC surface area planer, CNC lathe, CNC milling
EPTT, CNC planer, airplane grinder, cylindrical grinding EPTT, and a few coordinates screening EPTT.
Besides, we have taken numerous measures to stXiHu (West EPT) Dis.Hu (West EPT) Dis.rdize the approach movement this kind of as doing work and cooperating
with numerous EPT analysis models, schools and universities at property and abroad. We also continuously try to
soak up and improve the domestic EPTd manufacturing technologies, so as to encourage the upgrading and
optimization of the item and make the item quality reach the EPTd degree at home and abroad.
ESR -variety Roots Blower incEPTTs many sequence such as Three-leaves Type, Two-leaves Kind and Centrifugal
Type,which can be additional divided to hundreds of versions. The merchandise are extensively utilised in sewage treatment,
pneumatic conveying,EPT EPTT, aquaculture, foodstuff processing, electrical EPTT, petrochemical, cement,
mining and other EPTT. Our merchandise have these kinds of rewards as lower noise, energy conserving, secure high quality,
and EPTT service daily life, and many others.. With the income retailers through the domestic funds metropolitan areas, our products promote properly all
more than the place, and have been exported to North The usa,Russia, Malaysia, Indonesia, Vietnam, South Africa
and some other nations around the world. Obtaining obtained the ISO9001 JCEP EPTT System Certification, we have
estabEPTTd and enhanced the top quality assurance of the items developing, production, and installation.
From the procedure of design and style, study and deveXiHu (West EPT) Dis.Hu (West EPT) Dis.ment to the finished merchandise, we have obtained the EPTT
procedure managed independently, as a result providing the entire foundation and dependability assure for the goods stability
and longevity. Having a excellent sales network and following-revenue service, we provide our customers with higher-
top quality and far more productive support.All workers of our company sincerely welcome the wide masses of pals to
XiHu (West EPT) Dis.Hu (West EPT) Dis., and negotiate business with us.

Our Roots Blower Workshop

Doosn Horzitonal EPTT CEPTTr

The Application of the Roots Blower

Servicing and inspection
(1) Examine all fasteners and locating pins circumstances whether they are loosening.
(two) AlwaEPTTcheck whether or not the leakage phenomenon of the entire body.
(three) Shell out consideration to lubrication, amount of grease and noises when working,
deterEPT no matter whether it works unEPTTthe JCEP situations.
(four) Lubricant amp grease: The lubricant is for medium load EPTT EPT oil
(quality 220, kinematic viscosity of 198 ~ 242mm2 / s forty ordmC, flash stage ge two hundred ordmC)
The grease is butter (artificial lithium grease penetration 220-250, drop point ge
a hundred ninety ordmC). Exchange the lubricant and grease after very first two hundred hrs operating, and replace
once again following a moth managing. Later on, exchange the lubricant and grease according to the
surroundings and lubricant (grease) top quality propose a ideal substitution for 3
months.
(five) AlwaEPTTcheck the inlet air filter, cleanse or replace the filter in time.
(six) Blower overload occasionally not quickly shown, so shell out consideration to
the ingestion and exhaust force, bearing temperature and the existing boost tendencies
of motor to deterEPT whether the blower works typically
(seven) Ahead of disassembling the blower, the assembling relation and proportions
need to be recorded or calculated, make marks on factors to make sure the original
demands soon after assembling.
(eight) When newly EPTT or overhaul, the oil tank should be cleaned prior to use
and propose exchange all grease following 8 hrs working.

Typical failure cause and troubleshooting

No Failure Feasible reasons Elimination approaches
1 Friction
amongst the
impeller
(1) EPTTurities on the impeller,
resulting in the hole is as well little
(two) EPT use, ensuing in a
big backlash
(three) The EPT is not effectively mounted,
can not maintain the impeller
synchronization
(4) EPTT dress in resulting in
clearance rising.
(1) Get rid of filth and check
whether or not there is hurt parts
(2) Modify the EPT hole, substitute
the EPTs if the EPT backlash is
better than the typical thirty% to
50%
(3)Re-assemble the EPTs, maintain
the EPTTr contact area is to seventy five%
(four)Replace the bearing
two Collision
between
impeller and
wall, the
impeller prime
and casing
(one) Set up hole is not right
(2) functioning stress is too
large, exceeding the specified
worth
(3) Functioning temperature is as well high
(four) Casing or base deformation,
positioning supporter failure
(5) EPTT aXiHu (West EPT) Dis.al area is not very good
(1) Change the hole
(two) Recognize brings about of
overloading, decreased the force
to the specified benefit
(3) Verify the set up
precision and minimize the pipe
pressure
(4) Examine and mend bearings,
and to guarantee the clearance
(five)Relocation
three Temperature
as well high
(1) Oil in tank is way too a lot, way too
thick or way too filthy
(two) EPT or silencer is blocked
(3)The force is higher than
the specified value
(4)Excessive use of the
impeller, massive gap
(5)Bad ventilation, indoor
temperature is high, resulting in
inlet air’s higher temperature
(six) The rotating velocity is too reduced,end result in the belt slipping.
(one)Lessen the oil stage or rely on
oil
(two)Get rid of of blocking objects
(3)Lowering the force by means of
the blower
(four)Mend its clearance
(5)Open vents to reduce space
temperature
(6) Improve velocity to avert the
belt slipping.
4 Insufficient
flow
(one) The inlet filter is blocked
(2) EPTTeller put on and the gap
increases as well significantly
(3) Belt slipping
(four) Large EPTTs force loss
(five) EPTline air flow leakage
(one) Thoroughly clean the filter dust and
obstruction
(two) Fix the hole
(three)Tighten the belt and increase
the variety of belts
(four)Adjust the inlet strain to the
specified worth
(five) Verify and mend the pipeline
5 Oil leaking or
oil leaking
into the enclosure
(one)EPT tank place result in
leakage from the discharge port
(two) Seal wear, resulting in shaft oil spills
(three) The pressure is greater than
the specified price
(one)Reduce the oil amount
(two)Change the seals
(3)Clear the air vents, 2mm diameter faucet is mounted in the
center chamber, open up the faucet
unEPTTthe wall
6 Abnormal
vibration and
sound
(1)EPTT clearance exceeds the
specified benefit or bearing put on
(2) The EPT backlash is too
large, not in a tigEPTT fixed
(3) The foreign objects and dust
induced by the impeller and the
impeller, the impeller and the
housing collision
(four) the impeller shaft
deformation caused the collision
brought on by overload,
(five) Friction amongst the impeller
and the inlet housing triggered by
overheating
(6) Unbalance of the impeller
brought on by fJCEP or overseas
human body
(seven) Anchor bolts or other
fasteners are loosened
(1)Replace bearings or bearing
seat
(2)Reassemble EPT and ensure
backlash
(3)Cleansing blower, check the
circumstance is destroyed
(4)Verify the back stress, check out
the wheel and change hole
(five)Check the filter and again
pressure, enhance the gap
amongst the impeller inlet and the
casing
(six)Thoroughly clean the impeller and the
casing, to guarantee that the impeller
clearance operate
(7) Tighten the anchor bolts and
leveling the foundation.
seven EPT
overload
(one)Compared with the JCEP
strain, the stress difference
is huge that the again strain or
the inlet pressure is high
(two) Compared with the
tools needs, blower
circulation is also massive, so its stress
will increase
(3)Inlet filter is blocked, or outlet
pipe is obstructed or blocked
(four) Collusion or friction (stuck)
rotating components
(five) The oil level is also substantial
(six) NEPT V-belt is overheat,
vibration is as well big, or pulley
is also tiny
(one) Lessen the force to the
specified price
(2) Exhaust the excessive gasoline into
the environment or decrease the
blower velocity
(three) Remove the obstructions
(four)Immediately shut down, verify
the explanation
(5) Alter the oil to the proper
level
(six) Check out the belt pressure, and
changed it with massive diameter
pulley.

Our Provider

1. Pre sell provider two. Soon after market services
a. suggest the suitable design c. online specialized help,
b. manufacturing facility tour d. EPTT lifestyle spare areas and techinical support

Gurantee

12 months gurantee for our roots blowers

  in Kabul Afghanistan  sales   price   shop   near me   near me shop   factory   supplier Elt-125 High Efficieny Low Energy Roots Blower manufacturer   best   Cost   Custom   Cheap   wholesaler

Tags:

roller chain coupling

As one of leading roller chain coupling manufacturers, suppliers and exporters of mechanical products, We offer roller chain coupling and many other products.

Please contact us for details.

Mail:sales@roller-chain-coupling.com

Manufacturer supplier exporter of roller chain coupling.

Recent Posts